Skip to content
Outrich Data

Industry

Construction data licensing for AI

Outrich Data is a direct buyer of project records from general contractors, specialty contractors and construction managers with 50 or more employees. RFIs, submittals, change orders, daily logs and estimates are de-identified and licensed to AI labs for training and evaluation. Owner names, project locations and pricing are removed or generalized. You approve each package in writing.

Construction data and AI labs

A construction project generates paper at every step because money and liability follow the paper. A request for information asks the designer to resolve a conflict in the drawings. A change order prices the answer. A daily log records who was on site, what the weather did and what got built. Together they show how a building is planned and how plans meet the field.

Very little of this exists in public. AI labs building estimating, scheduling and project controls tools need real project records, with real ambiguity in them. The limits are contractual. Owners often require confidentiality. Designers usually own the drawings. Public and federal work can carry security rules.

Outrich Data buys from contractors with at least 50 employees and two years of project records. Closed projects are the usual scope. Each one is checked against its prime contract before its records are considered, and projects with restrictive terms are left out.

Records in demand

RecordWhat AI labs use it for
RFIs and responsesTraining models to spot a conflict or gap in contract documents and to phrase the question a designer can answer.
Submittal logs and review commentsTeaching models what reviewers check when a product or shop drawing is compared with the specification.
Change order requests with pricing backupFine-tuning on how scope changes are described, justified and priced, with amounts scaled or generalized.
Superintendent daily logsModeling field progress, crew counts, deliveries and delays as the people running the job recorded them.
Estimates and quantity takeoffsEvaluating whether a model's takeoff and cost build-up matches an estimator's on the same scope.
Punch lists and closeout recordsTraining on deficiency descriptions and the trade responsible, for inspection and quality tools.
Safety observations and toolbox talk recordsTraining hazard recognition models on site conditions and corrective actions, with worker names and injury details removed.

Rules that apply

What the title search looks at in construction.

Owner contract confidentiality clauses
Prime contracts often restrict disclosure of project information, and some owners prohibit any use beyond the project. Have counsel read the confidentiality and publicity terms for each project before its records are scoped.
Design professional ownership of drawings and specifications
Standard AIA contract forms treat drawings and specifications as instruments of service that the architect and its consultants own, with the contractor licensed to use them for the project only. Counsel should confirm that design documents stay out.
OSHA injury and illness recordkeeping (29 CFR Part 1904)
Injury logs and incident reports identify employees and include privacy protections for certain cases. Employee exposure and medical records carry separate OSHA access and confidentiality rules. Review with counsel which safety records can be used at all.
Federal and public project requirements
Government contracts can designate project information as controlled unclassified information or impose security clauses, and public agencies set their own records rules. Counsel should review each public project individually.
Subcontract and supplier confidentiality
Bids, unit prices and quotes from subcontractors and suppliers are often given in confidence or under a subcontract clause. Their pricing should be generalized or removed.

This page is general information, not legal advice. Whether your company can license a given dataset depends on your contracts, your privacy notices and the law where you and your customers are. Review it with your own counsel before signing anything.

Excluded

What we will not license.

  • Architect and engineer drawings, models and specifications you do not own.
  • Records from projects whose owner contract prohibits disclosure, unless the owner consents in writing.
  • Federal, defense and critical infrastructure project records subject to security restrictions.
  • Injury logs, incident reports with worker identities, drug test results and certified payroll.
  • Jobsite photos or camera footage in which workers or members of the public are identifiable.

Data types common in construction

Questions

Construction: what companies ask.

Can a contractor sell project records for AI training?
Often yes for records it wrote, such as RFIs, logs and estimates, once project and party identities are removed. The prime contract decides whether a given project can be included. Outrich Data buys directly and checks those terms project by project. Involve counsel.
Are drawings and BIM models part of a sale?
Usually not. Design documents generally belong to the architect and engineers. A contractor holds a license to build from them. Your own shop drawings and coordination notes are a separate question that depends on your subcontracts.
Could a competitor learn our pricing from the data?
The package is built to prevent that. Amounts are scaled or converted to relative values, project locations and dates are generalized, and your company is never named. You review the cleaned sample before approving anything.
Do we need the owner's permission for every project?
Only where the contract requires it. Some prime contracts are silent, some restrict disclosure of confidential information, and some forbid any outside use. Counsel should sort your closed projects into those groups first.

Find out if your data qualifies.

Eleven questions, about five minutes, no call required. You get an answer on screen and a written follow-up.

esc